GREECE › THESSALONIKI
Thessaloniki Underground Railway
- CATEGORYInfrastructure
- DEVELOPED YEAR2018
- DEVELOPED BYAKTOR SA
The project includes the construction of 9,5 kilometers of line with two independent single-track tunnels, 13 modern platform stations and should be completed by 2020. There will be 18 driver-less trains and the stations will be equipped with platform screen doors
PROJECT PRODUCTS
GEOSUB ISRDouble structured wall corrugated pliable pipe with color identity
N450CLASS
NormalIMPACT RESISTANCE
450 NtRESISTANCE TO COMPRESSION